Site Search
  • CASE STUDIES

    Case Studies
    Filter:
    Delivering the World's First 4K UHD IP Remote Production Trial Case Study (GVB-1-0737B-EN-CS) File size: 1.0 MB, posted Mar 04 2019
    Gearhouse Broadcast & UEFA: Australia/Germany/UK/US

    CHALLENGE: UEFA live remote 4K UHD production tests during the 2017 UEFA European U21 Championship Final

    SOLUTION: Kahuna Multiformat Switcher · LiveTouch Replay & Highlights System · Orbit IP Routing Control System · MV820 Multiviewers